Enviro C-11366 Instrukcja Użytkownika Strona 11

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 35
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 10
To install the burner:
1. Insert the mixing tube into the mixing
tube box (refer to Figure 8 or 9).
2. When the burner is resting in the
rebox ensure that the front edge of
the burner is lined up with the front
lip of the rebox (see Figure 10 or
11).
3. Re-install the log set or rock set
(see SECONDARY INSTALATION - LOG SET
INSTALLATION or SECONDARY INSTALATION -
ROCK SET INSTALLATION) and the door.
4. Check burner for proper operation.
Figure 11: Align Rock Set Burner With Firebox.
Bring front lip of burner
to front edge of firebox.
Maintenance And Service
11
Figure 10: Align Log Set Burner With Firebox.
Bring front lip of burner
to front edge of firebox.
FIREBOX BAFFLE REMOVAL:
The rebox bafe can be remove when cleaning the venting pipe.
1. Remove the glass door as shown in the MAINTENANCE AND SERVICE - GLASS DOOR REMOVAL.
2. Remove the two (2) Torx T-20 screws holding the front of the rebox bafe in place (refer to Figure
12). IMPORTANT: The bafe should be held in place when the screws are removed to prevent it from
falling, which could damage the rebox liner, log set, or rock set.
3. Carefully push the back of the bafe up while pulling the front down (see As in Figure 13) then pull
the bafe out of the rebox.
4. Re-install the rebox bafe and the door when done.
Figure 13: Firebox Bafe Removal.
A
A
B
Figure 12: Firebox Bafe Screws Removal.
Przeglądanie stron 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 34 35

Komentarze do niniejszej Instrukcji

Brak uwag