Enviro Cara Instrukcja Użytkownika Strona 27

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 46
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 26
27
Vent Pipe
Inside Finished Collar
Dry Wall
Wall Thimble
Exterior Wall
Siding
Minimum Vent Terminal 36”
(914mm) High Snorkel Kit.
Figure 46: Installation for Rear Vented;
33,500 Btu/hr.
Place the unit into position.
Attach a small section of pipe on the unit and mark exterior
wall where vent would pass through the wall.
Cut a 10” (25.4 cm) minimum hole in the wall to maintain
clearances to combustibles. Frame hole as shown in Figure
32.
Install a wall thimble, interior nished collar, and the vent
section through the wall.
THIS UNIT MUST BE VENTED WITH A 36” (91 cm) SNORKEL
KIT.
Seal around the vent terminal to the structure using a non-
hardening mastic.
Also refer to
InItIal InstallatIon - Vent ConfIguratIons and
restrICtor settIngs and InItIal InstallatIon - HorIzontal
InstallatIon.
Initial Installation
QUALIFIED INSTALLERS ONLY
conVerting top Vented into rear Vented:
This unit has been shipped as a 33,500 Btu/hr top-vented freestanding unit. This unit can be converted
Figure 45: Converting Top Vented into Rear Vented.
installation of rear Vented appliance:
to a rear vented unit for use with a 36” (915
mm) snorkel. Also refer to InItIal InstallatIon
- InstallatIon of rear Vented applIanCe.
1. Carefully remove the trivet and the
stovetop. Place on a soft surface as not to
damage the nish.
2. Remove the four (4) ¼” screws that hold
the ue collar elbow to the unit body.
3. Carefully remove the elbow being sure not
to damage the gasket that is glued to the
ue collar elbow, it seals the ue to the
rebox (see Figure 42).
4. Turn the elbow 180° to the rear vent
position and re-fasten with the screws
removed in step 2.
Venting
Gasket
Rotate 180
o
Przeglądanie stron 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 45 46

Komentarze do niniejszej Instrukcji

Brak uwag